[1]
Setiawan, I. et al. 2024. Optimisation of the Partial Runner Set-up Process in Plastic Injection Moulds Using Eight Steps in the Motorcycle Industry. Quality Innovation Prosperity. 28, 1 (Mar. 2024), 223–240. DOI:https://doi.org/10.12776/qip.v28i1.1980.