Setiawan, I., Perdana, B. C., & Aisa, N. N. (2024). Optimisation of the Partial Runner Set-up Process in Plastic Injection Moulds Using Eight Steps in the Motorcycle Industry. Quality Innovation Prosperity, 28(1), 223–240. https://doi.org/10.12776/qip.v28i1.1980