Waste Analysis in the Speaker Box Assy Process to Reduce Lead Time in the Electronic Musical Instrument Industry

Tri Aprianto (1), Arif Nuryono (2), Indra Setiawan (3), Hibarkah Kurnia (4), Humiras H. Purba (5)
(1) Universitas Mercu Buana, Indonesia,
(2) Universitas Bhayangkara Jakarta Raya, Indonesia,
(3) ASTRA Polytechnic, Indonesia,
(4) Universitas Pelita Bangsa, Indonesia,
(5) Universitas Mercu Buana, Indonesia

Abstract

Purpose: This study aims to analyse the waste in the production line to get an efficient production lead time.


Methodology/Approach: This research uses the integration method of value stream mapping and kaizen. Based on the analysis with expert judgment, it is known that the waste comes from an inefficient factory layout. Improvements by making changes to factory layouts and merging workstations.


Findings: This research has found waste caused by ineffective factory layouts based on Focus Group Discussions (FGD). Improvements by incorporating workstations and changes to the factory layout can reduce production lead time. The results showed that the production lead time decreased from 3.21 days to 2.31 days or a decrease in the ratio of 31.15%.


Research Limitation/Implication: This research can also improve manufacturing performance such as cost efficiency, efficient layout, and labour reduction. So for similar companies, this research can be a reference for making improvements in reducing waste that can improve manufacturing performance so that they can compete in national and international markets.


Originality/Value of paper: This paper provides benefits for the musical instrument industry regarding waste reduction. According to this research, lean production can increase the productivity and quality of the production system, because it can eliminate the waste of time or the production process. The new approach of this research is used the integration methods by involving experts through FGDs to make improvements and reduce waste in the production line.

References

Read More

Authors

Tri Aprianto
aprianto5785@gmail.com (Primary Contact)
Arif Nuryono
Indra Setiawan
Hibarkah Kurnia
Humiras H. Purba
Author Biographies

Tri Aprianto, Universitas Mercu Buana

Industrial Engineering Department

Universitas Mercu Buana

Jakarta

Arif Nuryono, Universitas Bhayangkara Jakarta Raya

Department of Industrial Engineering

Universitas Bhayangkara Jakarta Raya

Bekasi

Indra Setiawan, ASTRA Polytechnic

Department of Production and Manufacturing Engineering

ASTRA Polytechnic

Bekasi

Hibarkah Kurnia, Universitas Pelita Bangsa

Department of Industrial Engineering

Universitas Pelita Bangsa

Bekasi

Humiras H. Purba, Universitas Mercu Buana

Industrial Engineering Department

Universitas Mercu Buana

Jakarta

Aprianto, T., Nuryono, A., Setiawan, I., Kurnia, H., & Purba, H. H. (2022). Waste Analysis in the Speaker Box Assy Process to Reduce Lead Time in the Electronic Musical Instrument Industry. Quality Innovation Prosperity, 26(3), 53–65. https://doi.org/10.12776/qip.v26i3.1744

Article Details

Similar Articles

<< < 3 4 5 6 7 8 9 10 > >> 

You may also start an advanced similarity search for this article.

Integrating 5S and Kaizen Principles for Enhanced Quality Improvement: A Pharmaceutical R&D Laboratory Case Study

Charalambos Binellas, Panos Chountalas, Anastasios Magoutas, Natalia Chatzifoti
Abstract View : 1156
Download :342

Identification of the Elements and Systematisation of the Pillars of Solid Waste Management

Maximilian Espuny, Ana Carolina Ferreira Costa, José Salvador da Motta Reis, Luís César...
Abstract View : 1775
Download :827